Our Projects

Trident Power JB

Trident Power GR

TRIDENT POWER

At Trident Power, we are proud to be a leading provider of environmentally friendly energy projects that have a positive impact on the communities in which we operate.

Trident Power JB

Trident Power JB is establishing a small run-of-canal power project in the Province of Punjab, Pakistan. The power generated shall be supplied to a 8 Ton steel furnace for the production of billets for further sales to the market in Pakistan. The powerhouse and the associated steel industry shall be owned by Trident Power Limited.

Location Okara Punjab – Pakistan
Overall Power Generation Capacity to be generated 4.6 MW
Available Water Head after Construction Works of Plant 3.1 meters
Total Water Discharge Design/rated 56.64 m3/s
Type of Turbines to be Installed with available water head Kaplan Turbines
No. of Turbines Required 03 Nos
Rated Output Capacity of each Turbine 1.533MW
Project tentative timeline ~24 months
Commercial Operation February 2025
Trident Power GR

A detailed overview of the Lower Chenab Canal Hydropower Project, including its location, capacity, and expected timeline for completion. You can include images, maps, and diagrams to help explain the project.

Location: Wazirabad Punjab – Pakistan
Overall Power Generation Capacity to be generated: 7.55 MW
Available Water Head after Construction Works of Plant: 3.5 meters
Total Water Discharge Design/rated: 250 m3/s
Type of Turbines to be Installed with available water head: Kaplan Turbines
No. of Turbines Required: 04 Nos
Rated Output Capacity of each Turbine: 1.95 MW
Project tentative timeline: ~27 months
Commercial Operation: June 2025