Trident Power JB is establishing a small run-of-canal power project in the Province of Punjab, Pakistan. The power generated shall be supplied to a 8 Ton steel furnace for the production of billets for further sales to the market in Pakistan. The powerhouse and the associated steel industry shall be owned by Trident Power Limited.
| Location | Okara Punjab – Pakistan |
| Overall Power Generation Capacity to be generated | 4.6 MW |
| Available Water Head after Construction Works of Plant | 3.1 meters |
| Total Water Discharge Design/rated | 56.64 m3/s |
| Type of Turbines to be Installed with available water head | Kaplan Turbines |
| No. of Turbines Required | 03 Nos |
| Rated Output Capacity of each Turbine | 1.533MW |
| Project tentative timeline | ~24 months |
| Commercial Operation | February 2025 |
Trident Power GR
A detailed overview of the Lower Chenab Canal Hydropower Project, including its location, capacity, and expected timeline for completion. You can include images, maps, and diagrams to help explain the project.
| Location: | Wazirabad Punjab – Pakistan |
| Overall Power Generation Capacity to be generated: | 7.55 MW |
| Available Water Head after Construction Works of Plant: | 3.5 meters |
| Total Water Discharge Design/rated: | 250 m3/s |
| Type of Turbines to be Installed with available water head: | Kaplan Turbines |
| No. of Turbines Required: | 04 Nos |
| Rated Output Capacity of each Turbine: | 1.95 MW |
| Project tentative timeline: | ~27 months |
| Commercial Operation: | June 2025 |